Visualization and control of the treatment process at the Prelouc Wastewater Treatment Plant

In 2002, a new wastewater treatment plant for the town of Prelouc was built and put into operation. The operator of the plant is the Czech joint-stock company Vodovody a kanalizace Pardubice (hereinafter referred to as VaK).

Control system

The complete visualization and control system for the plant was implemented by the PROTECO company. To control the process of mechanical pre-treatment and the blower room,
a Tecomat NS950 PLC with a CPM 2B central unit was employed. Another Tecomat NS950 PLC with a CPM 1D central unit was used to control the process of sludge treatment.

Prelouc Wastewater Treatment Plant

Prelouc Wastewater Treatment Plant

Using radio communication, important data and other operational values are transmitted to the VaK main control room. For this purpose, the room was fitted with the Reliance SCADA/HMI system. In spite of the complexity of the control system, we managed to provide it with unmanned operation.

Example of a visualization window

Installation details

Country:

  • Czechia

Title:

  • Visualization and control of the treatment process at the Prelouc Wastewater Treatment Plant

Implemented by:

  • PROTECO

Year:

  • 2002

Control system:

  • Tecomat NS950

SCADA software:

  • Reliance Runtime Control

Try the Reliance SCADA system right now!

Try the Reliance SCADA/HMI system on several sample visualizations.

Try the Reliance SCADA/HMI system on several sample visualizations or download the trial version installer to your computer for free.

Try the Reliance SCADA system right now Try the Reliance SCADA system right now Try the Reliance SCADA system right now