In 2000, a new control system for the wastewater treatment plant in Podebrady was implemented by the SIGMAINVEST company. This company's Engineering Division was responsible for the construction of the high-current distribution system and the construction of the plant's control and measuring stations.
The complete visualization and control system for the plant was implemented by the PROTECO company. To control the process of mechanical pre-treatment and the blower room,
a Tecomat NS950 PLC with a CPM 2B central unit was employed. Another Tecomat NS950 PLC with a CPM 1D central unit was used to control the process of sludge treatment.
The plant's processes are also controlled by a Tecomat NS950 PLC. This PLC is, via a serial link, connected to the control room's PC equipped with the Reliance SCADA/HMI system. The control room's PC is used to reliably control and monitor the operation of the entire wastewater treatment plant and to save operating data for later analysis.
The wastewater treatment plant's control room
Visualization of the 1st section of the wastewater treatment plant's processes
Visualization of the 2nd section of the wastewater treatment plant's processes
Try the Reliance SCADA/HMI system on several example projects or download the installer of the trial version for free.
Country
Czechia
Title
Visualization and control of the wastewater treatment plant's processes in the town of Podebrady
Implemented by
SIGMAINVEST
Year
2000
Control system
Tecomat NS950
Software
Reliance Control with 1,500 data points