Visualization and control of the boiler room and hardening chambers at KM BETA

In 2001, the old control system at KM BETA Kyjov for the hot water boiler room and hardening chambers was replaced with a Tecomat NS950 PLC. This PLC controls the operation of the boiler room with two boilers. MA-3 burner controls are used for controlling the burners. The Tecomat NS950 PLC also controls the process of hardening roof tiles in eleven chambers.

Monitoring and the whole production process are controlled from a central workstation equipped with the Reliance SCADA/HMI system. Operators can set process regulation parameters and monitor operation as well as alarms/events, which are archived in case a later review of the production process is required.

The process of hardening roof tiles can also be controlled with the external regulator, TECOREG TR05, which is connected to the central workstation.

Examples of visualization windows

Installation details

Country:

  • Česko

Title:

  • Visualization and control of the boiler room and hardening chambers at KM BETA

Implemented by:

  • ELPRO Kolin

Year:

  • 2001

Control system:

  • 1 x Tecomat NS950
  • 1 x TECOREG TR05

SCADA software:

  • 1 x Reliance 3 Runtime

Try the Reliance SCADA system right now!

Try the Reliance SCADA/HMI system on several sample visualizations.

Try the Reliance SCADA/HMI system on several sample visualizations or download the trial version installer to your computer for free.

Try the Reliance SCADA system right now Try the Reliance SCADA system right now Try the Reliance SCADA system right now