The new wastewater treatment plant for the town of Prelouc was built and put into operation in 2002. The operator of the plant is Vodovody a kanalizace Pardubice, the Czech joint-stock company (hereinafter VaK).
The complete visualization and control system for the plant was implemented by the PROTECO company. To control the process of mechanical pre-treatment and the blower room,
a TECOMAT NS950 PLC with a CPM 2B central unit was employed. Another TECOMAT NS950 PLC with a CPM 1D central unit was used to control the process of sludge treatment.
Prelouc Wastewater Treatment Plant main control room
Using radio communication, important data and other operational values are transmitted to the VaK main control room. For this purpose, the room was fitted with the Reliance SCADA/HMI system. In spite of the complexity of the control system, we managed to provide it with unmanned operation.

Visualization of the treatment process


Country
Czech Republic
Name
Visualization and control of the treatment process at the Prelouc Wastewater Treatment Plant
Implemented by
PROTECO s.r.o.
Date
2002
Control System
2x TECOMAT NS950
Software
1x Reliance Runtime Control with 3,000 data points
| Top |