In 2001, the old control system at KM BETA Kyjov for the hot water boiler room and hardening chambers was replaced with a TECOMAT NS950. This PLC controls the operation of the boiler room with two boilers. MA-3 microprocessor automatics are used for controlling the burners. The TECOMAT NS950 also controls the process of hardening roof tiles in eleven chambers.


Monitoring and the whole production process are controlled from a central workstation which is equipped with the Reliance SCADA/HMI system. Operators can set process regulation parameters and monitor operation as well as alarms/events, which are archived in case later review of the production process is required.


The process of hardening roof tiles can also be controlled with the external regulator, Tecoreg TR 05, which is connected to the central workstation via the Reliance SCADA system.


Boilers in the production hall of KM Beta

Boilers in the production hall of KM Beta



Examples of visualization windows

Visualization window displaying hardening systems

Visualization window displaying hardening systems



Visualization window displaying water heating systems

Visualization window displaying water heating systems

Family house – illustration pictureKM BETA, a.s. banner