In 2004 a new hydro-electric power station was put into operation in the city of Fujiyoshida (central Japan). All industrial devices (Francis turbine, induction generator, water intake device and electrical installation with Tecomat PLCs) were implemented by the Czech company CKD TURBO TECHNICS s.r.o., and the joint-stock company Mavel a.s. incorporated.
The hydro-electric power station is composed of the 132kW output horizontal Francis turbine connected with induction generator via dry-disc joint, a control hydraulic unit of the Francis turbine, water valves controlled from the control room and intake devices (water-gate, trashracks and telescopic trashrack winnower).

Supervisory computer with the Reliance application in the hydro-electric power station premises
All operations (failure automatics, drives, supervisory and control units) are handled by one PLC Tecomat TC 600. User software implemented by CKD TURBO TECHNICS s.r.o. company controls operation of the machine unit, water inlet and allows unmanned operation of the hydro-electric power station.
The central (SCADA-based) control system of the hydro-electric power station, including the entire visualization, is provided by the Reliance system. The Reliance system permits a remote view and visual control of the hydro-electric power station via the Internet.

Hydro-electric power station handover ceremony


Country
Japan
Name
Control system for horizontal Francis turbine with 132kW output
Implemented by
CKD TURBO TECHNICS s.r.o.
Date
2004
Control system
1x TECOMAT TC600
Software
1x Reliance Runtime Control for 250 data points